North Vancouver, BC
We have extensive experience managing warehousing projects from site layout through startup. We carry out space planning requirements through to product planning. Mark Dean has worked on over 150 different projects in a wide variety of industries, both public and private. We carry out the following type of projects:
warehouse consulting;
methods and procedures improvement analysis;
staffing and equipment requirements analysis to meet volume throughputs;
inventory analysis and slot sizing using computer analysis;
space requirements planning;
concept layouts and cost estimates;
site traffic flow, parking and building footprints;
preliminary building layouts including column spacing, storage and work areas, docks, doors, battery charging, administrative and support facilities;
detailed layout planning;
identifying storage and mobile equipment alternatives, writing specifications, tendering and evaluating bids;
product planning (preslot), numbering and labelling systems;
slotting;
equipment installation supervision or inspections; and relocation planning including products.
430-29th St W
North Vancouver, BC V7N 4H4
CA
430-29th St W
North Vancouver, BC V7N 4H4
CA
Legal Name: Mark Dean & Associates
Number of Employees: 1
CA
Ballard Power Systems, BC Hydro, BC Gas, BC Transit, BC Ferry Corp., Telus, Fletcher Challenge, Overwaitea Foods, Neptune Food Services, H. Y. Louie, Associated Grocers, Martin-Brower, Alberta Liquor Control Board, BC Liquor Distribution Branch, Dairyworld, Lucerne Foods, Expo 86, Yves Veggie Cuisine, Nalleys Canada, J. D. Sweid, Molson Brewery, Pacific Western Brewing Co., Alpha Pharmaceuticals, Woodward Stores, Volkswagen Canada, UAP/NAPA, Alberta Education, Simon Fraser University, Western Waffles, Ethiopian Airlines, Vancouver International Airport, Fairmont Vancouver Hotel, B. U. K. Realty, Ames Bros. Distributors, Fraser Health Authority (BC), Greater Vancouver Regional District, Monk Office Supply, Sharper Innovations
Managed a $1.9 million racking contract from design through installation for a major food service distributor. Optimized a plant layout for a gas utility company's meter shop. Carried out projects from concept to detail design, implementation and commissioning.
Corporate Expertise:
----------------------- We have worked on preliminary and detail design for an air cargo terminal in Addis Ababa, Ethiopia. We can perform the same design function for all warehousing and cargo terminal operations.
Corporate Language Capabilities:
----------------------- English
Proj: Ethiopian Airlines Air Cargo Terminal Country: Ethiopia Contribution:
All layout planning including detailed equipment specifications for tendering.
Title: Owner
Area of Responsibility: Research/Development/Engineering
Phone: Show phone
Fax: Show fax
Email: Show email
We provide consulting and training services for primary care facilities to reduce waste using lean tools and techniques based on the Toyota Production System (TPS).
Pre-slotting and Slotting of warehouse products
541330
3910-Conveyors, 3920-Materials Handling Equipment, Nonself- Propelled, 3930-Warehouse Trucks and Tractors, Self-Propelled, 3990-Materials Handling Equipment, Miscellaneous, B219-Other Engineering Studies, C115-Industrial Buildings, C117-Warehouse Buildings, C200-Architect and Engineering Services - Not Related to Construction, C211-Architect - Engineer Services (incl. landscaping, interior layout and designing)