Spirax Sarco Canada Limited

Address: 383 Applewood Cres.
Concord, ON L4K 4J3
CA

Mailling Address: 383 Applewood Cres.
Concord, ON L4K 4J3
CA

Phone: (905) 660-5864

Toll Free: (800) 265-7747

Fax: (905) 660-5503

Email: Click Here

Map it: Click Here

Website: http://www.spiraxsarco.com/ca

Spirax Sarco Canada Limited

Company Details

Year Established: 1928

Total Sales ($CDN): $500,000 - $1,000,000

Number of Employees: 35

Company Information

Robert Grattage
Title: President & General Manager
Area of Responsibility: Management Executive
Telephone: (905) 660-5864
Fax: (905) 660-5503
Email: Click Here

Bruce Moninghoff
Title: President & General Manager
Telephone: (905) 660-5864
Fax: (905) 660-5503
Email: Click Here

David Blair
Title: Vice President, Finance
Area of Responsibility: Finance/Accounting
Telephone: (905) 660-5510
Fax: (905) 660-5503
Email: Click Here

Products

Steam Traps, Power Boilerhouse

Steam Traps, Nes

Pipe Fittings Nes

Heating Steam Generating Units, Parts, Nes

Humidifiers, Self-contained

Pressure Measuring/Controlling Inst

Strainers

Moisture Separators

Valves And Fittings

Humidifiers

Steam-to-steam Generators
Humidification

Services

Steam System Audits & Surveys Plant Audit: complete system analysis and comprehensive report on boiler house, steam system, process applications (branch distribution, temperature and pressure controls, proper steam pressure, overheat protection, steam metering, draining considerations, air venting, vacuum control and humidification), heat exchange systems, condensation recovery and inspection of electric or pressure powered condensate return pumps. Steam Trap Survey: perform analysis to establish a regular maintenance program and reduce future energy losses and costly maintenance downtime. Process System Analysis: process plant or single installation analysis to determine optimum control of equipment, increase production, improve product quality or reduce downtime due to frequent adjustment or equipment failures. Steam Trap Appraisal: identifies and tags each item of equipment by type, size and locations, with comments on each with regard to application. The report will also provide performance details on each item of equipment, plus advice on any action which is considered necessary to ensure efficient operation.